Maher Abdullah Alsulaimi & Co. CJSC
Production & Sales Performance Dashboard
YTD 2026 (Jan – Jun / H1) · vs 2026 Annual Budget & Plan
Prepared for
Executive Committee
Presentation
Monday, 25 May 2026
GBQ Factory · Period: Jan – Jun 2026 (6 months / H1 · Sales through May, Jun pending) Annual budget & plan: Full year 2026 Linear pace at 4/12: 33.33%

A · Executive KPI Snapshot

YTD Sales (Actual)
19.21 M
▲ +14.51% vs YTD budget
YTD Budget 16.78 M · +2.43 M ahead
Annual Budget Achv
44.20%
+2.53 pp ahead of pace (5/12 = 41.67%)
Annual Budget 43.46 M SAR
YTD Cycles Actual
582,413
▲ +10.31% vs plan 528,000
52.28% of annual 1.114 M target (6/12 = 50.00%)
YTD OEE
67.10%
▲ +3.10 pp vs target 64.0%
A 76.57 × P 87.24 × Q 99.99
YTD Blocks
11.13 M
▲ +8.66% vs plan 10.24 M
51.45% of annual 21.63 M target
YTD Waste
0.090%
≈ 9 pcs per 1,000 blocks
Jan–Jun · Q 99.99% consistent
Sales / Cycle
39.68 SAR
Jan–May basis · Jun sales pending
19.21 M ÷ 484,118 cycles (Jan–May)
Sales / Block
2.20 SAR
Jan–May basis · Jun sales pending
19.21 M ÷ (484,118 × 18) = 8.71 M
Avg Cycle Time
17.21 s
+0.21 s vs 17.0 s target
Range 16.83 – 17.49 s (Jun 17.40)
Downtime YTD
1,015.2 h
23.4% of full time 4,344 h
Planned 871.1 / Unplanned 144.1 h
FG Stock Coverage
85.2%
▲ Continued recovery · 3 SKUs still low
393,663 / 462,000 pcs (01-Jul)
Raw Material Stock
62.2%
2 materials still Critical
N.silica 52.9% / Aggr 4.75 38.6%

B · Annual Performance Overview — YTD Progress vs Full-Year 2026 Targets

Sales (SAR) — Annual Budget
44.20% of 43,458,052
+2.53 pp ahead of linear pace (41.67%)
YTD 19,209,077Remaining 24,248,975
Pace required for the remaining 7 months: 3.46 M / month · YTD avg 3.84 M / month
Cycles — Annual Plan
52.28% of 1,114,000
+2.28 pp ahead of linear pace (6/12 = 50.00%)
YTD 582,413Remaining 531,587
Pace required for remaining 6 months: 88,598 / month · YTD avg 97,069 / month
Blocks (pcs) — Annual Plan
51.45% of 21,627,000
+1.45 pp ahead of linear pace (6/12 = 50.00%)
YTD 11,126,388Remaining 10,500,612
Pace required for remaining 6 months: 1.75 M / month · YTD avg 1.85 M / month

C · Sales Monthly Detail (Actual vs Budget)

January
4.59 M
116.1%
Budget 3.95 M · +0.64 M
February
3.78 M
135.1%
Budget 2.80 M · +0.98 M
March
2.70 M
96.4%
Budget 2.80 M · −0.10 M
April
4.64 M
121.2%
Budget 3.83 M · +0.81 M
May
3.50 M
103.05%
Budget 3.40 M · +0.10 M
GBQ — Sales Actual vs Budget (Monthly + Achievement %)
SAR (M) bars · Achievement % line · Jan – Jun 2026 (Jun actual pending)
MonthBudget (SAR)Actual (SAR)VarianceAchv %
January3,952,7884,591,118+638,330116.1%
February2,797,3343,780,149+982,816135.1%
March2,798,2512,696,643−101,60896.4%
April3,826,1464,636,985+810,839121.2%
May3,400,4973,504,182+103,685103.05%
June3,762,720
YTD Total (Jan–May)16,775,01519,209,077+2,434,062114.51%
Annual 2026 Budget43,458,052YTD = 44.20%Remaining 24,248,9757 months left

D · Production Cycles — Monthly Plan vs Actual

Monthly Cycles (thousands) · Δ% shown above each month
Jan – Jun 2026 · YTD Plan 528k / Actual 582k = 110.3%
MonthPlanActualEUPVarianceΔ%
January102,000109,019134,274+7,019+6.88%
February72,000104,765124,331+32,765+45.51%
March72,00073,97986,431+1,979+2.75%
April98,000102,304123,907+4,304+4.39%
May88,00094,051110,056+6,051+6.88%
June96,00098,295117,510+2,295+2.39%
YTD Total (Jan–Jun)528,000582,413696,509+54,413+10.31%
Annual 2026 Plan1,114,000YTD = 52.28%Remaining 531,587at 6/12 = 50.00%

E · OEE Components — Availability × Performance × Quality

Availability (%)
Run time ÷ Full time · YTD 77.62%
Performance (%)
Std cycle time ÷ Actual · YTD 87.57%
Quality (%)
1 − Waste % · YTD 99.99% (file value)
OEE Monthly Roll-up = A × P × Q
Decomposition of the headline OEE figure
MonthAvailabilityPerformanceQualityOEEvs Target 64.0%
January84.38%89.12%99.99%75.19%+11.19 pp
February87.57%88.03%99.99%77.08%+13.08 pp
March56.43%85.78%99.99%48.40%−15.60 pp
April82.08%87.36%99.99%71.70%+7.70 pp
May71.37%86.36%99.99%61.63%−2.37 pp
June78.88%86.21%99.99%68.00%+4.00 pp
YTD (Jan–Jun)76.57%87.24%99.99%66.79%+2.79 pp

F · Downtime Analysis — Reason Pareto & Planned vs Unplanned

YTD Downtime by Reason — Pareto
Hours bars + Cumulative % · Total 1,015.2 h (Jan–Jun)
Planned vs Unplanned Downtime
YTD breakdown with hours and percentages
Planned P
871.1 h
85.8% of total
Cleaning 411h · PM 282h · Off 178h
Unplanned U
144.1 h
14.2% of total
Breakdown 108h · Other 27h · Adj 10h

G · Production Mix by SKU (YTD)

YTD Product Mix
582,413 cycles · 11,126,388 blocks · Jan–Jun (H1) · Donut shows % shares
SKUCyclesBlocksCycle ShareBlock Share
HB 20×20371,2356,682,23063.74%60.06%
Thermo 7.5 white64,9751,169,55011.15%10.51%
HB 20×1566,9971,607,92811.50%14.45%
HB 20×3030,032360,3845.16%3.24%
HB 20×1032,6521,077,5165.61%9.68%
Thermo 30 white11,436137,2321.96%1.23%
Thermo 7.5 blue4,84087,1200.83%0.78%
Thermo Jaffali2464,4280.04%0.04%
Total (Jan–Jun)582,41311,126,388100.0%100.0%

H · Raw Material Consumption & Inventory

YTD Raw Material Consumption
Total kg · kg / cycle · % of total mix
MaterialYTD kgkg / cycle% total
N.silica46,112,512118.2231.0%
Aggregate 4.75 mm32,245,08282.6721.7%
Aggregate 9.5 mm27,690,04370.9918.6%
C.sand20,468,50152.4713.8%
Water11,395,96529.227.7%
Cement10,703,92027.447.2%
Total148,616,023381.00100.0%
Finished Goods Inventory — 01 May 2026
Actual vs 7-day safety stock
SKUActualSafety (7-d)%Risk
Block 1017,60049,50035.6%Critical
Block 1526,99748,00056.2%Watch
Block 2070,358270,00026.1%Critical
Block 303,9139,00043.5%Critical
Thermo 30 white1,1346,00018.9%Critical
Thermo 7.5 white18,82672,00026.1%Critical
Thermo Jaffali773,0002.6%Critical
Thermo EPS 3014,5000.0%Critical
Total138,906462,00030.1%Critical
Raw Material Inventory — 01 May 2026
Actual (kg) vs 3-day safety stock
MaterialActual (kg)Safety stock (3-d)%Risk
Cement161,400300,00053.8%Watch
N.silica965,5781,500,00064.4%Watch
Aggregate 9.5 mm998,309900,000110.9%OK
Aggregate 4.75 mm360,5211,050,00034.3%Critical
C.sand194,379700,00027.8%Critical
Total2,680,1874,450,00060.2%

I · Executive Insights & Recommended Actions

1
Sales YTD beat budget by +14.5% (+2.43 M SAR)
YTD actual 19.21 M vs YTD budget 16.78 M (Jan–May). Feb (+35.1%) and Apr (+21.2%) drove over-performance. May +3.05% — steady. On track for annual 43.46 M.
2
Annual budget 44.2% achieved at 5/12 of year
+2.53 pp ahead of linear pace (41.67%). Remaining 24.25 M over 7 months = 3.46 M/month required vs YTD avg 3.84 M/month — comfortable margin.
3
Production cycles +12.1% vs YTD plan (Jan–May)
484,118 actual vs 432,000 planned. Blocks +9.4% vs plan (9.18 M actual). Operationally over-delivering on volume across five months.
4
March OEE collapsed to 48.4% — Availability driver
A 56.4% (vs YTD 77.6%) was the single driver. Performance 85.8% and Quality 99.99% held steady. Idle 324 h (122 h Off + 127 h PM).
5
86% of downtime is Planned
743.5 h planned vs 119.6 h unplanned (Jan–May). Cleaning (331 h) + PM (235 h) + Off (178 h) — Cleaning is the largest single bucket and the best process-redesign target.
6
FG stock recovered to 62.0% of 7-day safety (vs 30.1% at end-Apr)
May replenishment lifted FG stock to 286,231 / 462,000 pcs. Three SKUs still below safety (Block 20 L 42%, Thermo 30 9%, Thermo 7.5 blue 36%) — monitor closely.
7
Two raw materials below 3-day safety
Aggregate 4.75 mm (34.3%) and C.sand (27.8%) — RM-driven stoppage risk.
8
Waste stable Apr → May at 7 pcs/1,000
May waste held at 7 pcs/1,000 (Q 99.99%) after Mar peak of 9. Five-month range 5–9 pcs/1,000.
GRM Factory · Period: Jan – May 2026 (5 months · June data pending) Annual budget & plan: Full year 2026 Linear pace at 4/12: 33.33%

A · Executive KPI Snapshot

YTD Sales (Actual)
17.14 M
▲ +9.09% vs YTD budget
YTD Budget 12.66 M · +1.15 M ahead
Annual Budget Achv
33.34%
≈ on pace (33.33%)
Annual Budget 41.43 M SAR
YTD Cycles Actual
450,964
▼ −2.37% vs plan 461,910
38.28% of annual 1.178 M target (5/12 = 41.67%)
YTD OEE
58.9%
▼ −6.84 pp vs target 65.74%
A 69.45 × P 84.90 × Q 99.91
YTD Blocks
7.61 M
▲ +34.71% vs plan 5.65 M
53.90% of annual 14.12 M target
YTD Waste
0.130%
▲ 13.3% better than target
Target 0.150% · Jan–May
Sales / Cycle
38.00 SAR
Revenue productivity
17.14 M ÷ 450,964 cycles (Jan–May)
Sales / Block
2.11 SAR
Per normalized block
17.14 M ÷ (450,964 × 18) = 8.12 M
Avg Cycle Time
17.98 s
+0.38 s vs 17.6 s target
Range 17.50 – 18.28 s (May 18.28)
Downtime YTD
1,308.5 h
37.5% of full time 3,492 h
Planned 752.25 / Unplanned 556.25 h
FG Stock Coverage
N/A
Data not in source file
Capture required
Raw Material Stock
N/A
Data not in source file
Capture required

B · Annual Performance Overview — YTD Progress vs Full-Year 2026 Targets

Sales (SAR) — Annual Budget
33.34% of 41,426,546
≈ on linear pace (33.33%)
YTD 13,811,928Remaining 27,614,618
Pace required for remaining 8 months: 3.45 M / month · YTD avg 3.45 M / month
Cycles — Annual Plan
38.28% of 1,177,910
−3.39 pp behind linear pace (5/12 = 41.67%)
YTD 450,964Remaining 726,946
Pace required for remaining 7 months: 103,849 / month · YTD avg 90,193 / month · needs +15.1%
Blocks (pcs) — Annual Plan
53.90% of 14,123,820
+12.23 pp ahead of linear pace (5/12 = 41.67%)
YTD 7,612,170Remaining 6,511,650
Pace required for remaining 7 months: 0.93 M / month · YTD avg 1.52 M / month · strong buffer

C · Sales Monthly Detail (Actual vs Budget)

January
3.67 M
97.7%
Budget 3.75 M · −0.08 M
February
2.86 M
116.5%
Budget 2.46 M · +0.41 M
March
2.81 M
103.9%
Budget 2.71 M · +0.10 M
April
4.47 M
119.3%
Budget 3.74 M · +0.72 M
May
3.33 M
101.14%
Budget 3.29 M · +0.04 M
GRM — Sales Actual vs Budget (Monthly + Achievement %)
SAR (M) bars · Achievement % line · Jan – May 2026
MonthBudget (SAR)Actual (SAR)VarianceAchv %
January3,752,2853,667,445−84,84097.7%
February2,455,5402,861,349+405,809116.5%
March2,709,9342,814,883+104,950103.9%
April3,743,7954,468,251+724,457119.3%
May3,287,7013,325,182+37,482101.14%
June3,704,036
YTD Total (Jan–May)15,949,25417,137,111+1,187,857107.45%
Annual 2026 Budget41,426,546YTD = 41.37%Remaining 24,289,4357 months left

D · Production Cycles — Monthly Plan vs Actual

Monthly Cycles (thousands) · Δ% shown above each month
Jan – May 2026 · YTD Plan 462k / Actual 451k = 97.6%
MonthPlanActualEUPVarianceΔ%
January105,00081,63382,764−23,367−22.25%
February85,00081,39792,274−3,603−4.24%
March76,41083,51091,722+7,100+9.29%
April104,00099,798108,069−4,202−4.04%
May91,500104,626115,089+13,126+14.34%
June103,500
YTD Total370,410346,338374,829−24,072−6.50%
Annual 2026 Plan1,177,910YTD = 38.28%Remaining 726,946at 5/12 = 41.67%

E · OEE Components — Availability × Performance × Quality

Availability (%)
YTD 69.45% · Range 56.0 – 75.5% (Jan–May)
Performance (%)
YTD 84.90% · Range 68.4 – 99.0% (Jan–May)
Quality (%)
YTD 99.91% · Range 99.85 – 100.00% (Jan–May)
OEE Monthly Roll-up = A × P × Q
Decomposition of the headline OEE figure
MonthAvailabilityPerformanceQualityOEEvs Target 65.74%
January56.05%95.30%99.90%53.30%−12.44 pp
February66.82%98.95%99.85%66.00%+0.26 pp
March75.49%68.40%99.90%51.60%−14.14 pp
April75.28%83.40%99.85%62.70%−3.04 pp
May74.60%81.00%100.00%60.80%−4.94 pp
June
YTD (Jan–May)69.45%84.90%99.91%58.90%−6.84 pp

F · Downtime Analysis — Reason Pareto & Planned vs Unplanned

YTD Downtime by Reason — Pareto
Hours bars + Cumulative % · Total 1,308.5 h (Jan–May, GBQ-aligned categories)
Planned vs Unplanned Downtime
YTD breakdown with hours and percentages
Planned P
752.25 h
57.5% of total
Cleaning 266.25h · PM 223.5h · Off 262.5h
Unplanned U
556.25 h
42.5% of total
Breakdown 468h · Other 84.5h · Adjustments 3.75h

G · Production Mix — Category & SKU (YTD)

YTD Product Mix by Cycles
450,964 cycles · Jan–May · Three categories (Blocks 86% / Interlock 12% / Curbstone 2%)
Category / SKUCyclesShare
Blocks388,35886.12%
— HB 20×20290,33964.38%
— American Block 2040,6549.02%
— HB 20×1540,1898.91%
— Thermo Block11,2382.49%
— HB 20×105,9381.32%
Interlock52,37911.62%
Curbstone10,2272.27%
Total (Jan–May)450,964100.0%

H · Paver Output (GRM-specific)

Paver Output — Plan vs Actual (m²)
YTD Plan 297,051 m² vs Actual 101,232 m² = −65.9%
Single largest production underperformance in either factory's file — review capacity allocation between blocks and pavers.

I · Executive Insights & Recommended Actions

1
Sales YTD beat budget by +7.5% (+1.19 M SAR)
YTD actual 17.14 M vs YTD budget 15.95 M (Jan–May). Apr (+19.3%) and Feb (+16.5%) drove over-performance. May +1.1% — steady close. On track for annual 41.43 M.
2
Annual budget 41.37% — slightly behind pace (5/12 = 41.67%)
−0.30 pp behind linear pace. Remaining 24.29 M over 7 months = 3.47 M/month required vs YTD avg 3.43 M/month. Close watch needed.
3
YTD cycles −2.4% vs plan — −3.4 pp behind annual pace
450,964 actual vs 461,910 planned (Jan–May). Annual achievement 38.3% vs 41.7% linear. May +14.3% over plan recovered momentum after Apr.
4
March OEE shock 51.6% — Performance driver
P fell to 68.4% (vs YTD 86.1%). A 75.5% was actually highest of YTD. Different cause vs GBQ March shock (which was A-driven).
5
Paver output −65.9% vs YTD plan (worsening)
297,051 m² planned vs 101,232 m² actual. May −87% (only 7,819 m²). Mix shifted further from pavers to blocks — review allocation.
6
58% of downtime is Planned (Cleaning + PM + Off)
Cleaning 266.25 h + PM 223.5 h + Planned Off 262.5 h = 752.25 h planned (57.5%). Unplanned 556.25 h driven by Breakdown 468 h (35.8% of total downtime Jan–May).
7
Waste 16.7% better than target
YTD 0.125% vs 0.15% target. Quality discipline is positive.
8
Blocks +34.7% vs plan, 53.9% of annual already
7.61 M actual vs 5.65 M planned (Jan–May). Annual block target already 54% achieved — outstanding buffer. May +66.5% over plan was the strongest month.
9
SAR / block essentially in line with GBQ (cycles × 18 basis)
GRM 2.22 SAR/block vs GBQ 2.24 SAR/block — under the normalised cycles × 18 mold capacity basis the two factories monetise blocks at the same price point.
Group (GBQ + GRM) · Period: Jan – Jun 2026 (GBQ H1 · GRM Jan–May · GRM Jun pending) Annual budget & plan: Full year 2026 Linear pace at 4/12: 33.33%

A · Consolidated Group KPIs

Group YTD Sales
36.35 M
▲ +11.07% vs YTD budget
YTD Budget 32.72 M · +3.62 M ahead
Group Cycles
935,082
▲ +4.61% vs plan 893,910
GBQ 51.8% · GRM 48.2% · Jan–May
Group OEE
62.99%
▼ −1.75 pp vs target avg
GBQ 66.80% / GRM 58.90% (Jan–May)
Group Blocks
16.79 M
▲ +20.62% vs plan 13.92 M
16,788,393 pcs (Jan–May)
Group Downtime
2,171.6 h
30.5% of full time 7,116 h
Planned 1,495.75 / Unplanned 675.85 h
GRM Sales Share
47.15%
17.14 M of 36.35 M
vs Annual Budget share 48.8%
Group Sales / Cycle
38.87 SAR
Revenue productivity
36.35 M ÷ 935k cycles (Jan–May)
Better OEE
GBQ
66.80% vs GRM 58.90%
Gap 7.90 pp
Better SAR / Block
GBQ
GBQ 2.20 vs GRM 2.11
cycles × 18 normalised basis
Group Quality
99.95%
YTD avg both factories
Range 99.85 – 100.00% (Jan–May)
GRM — Avg Sales Price / Cycle
38.00 SAR
YTD Jan–May 2026
17,137,111 SAR ÷ 450,964 cycles
GRM — Avg Sales / Equiv. Block
2.11 SAR
YTD Jan–May 2026
38.00 SAR ÷ 18 (cycle × 18 basis)

B · Annual Performance Overview — Group YTD vs 2026 Targets

Sales (SAR) — Annual Budget
42.82% of 84,884,597
+1.15 pp ahead of linear pace (41.67%)
YTD 36,346,188Remaining 48,538,410
Pace required for remaining 7 months: 6.93 M / month · YTD avg 7.27 M / month
Cycles — Annual Plan
40.80% of 2,291,910
−0.87 pp behind linear pace (5/12 = 41.67%)
YTD 935,082 (Jan–May)Remaining 1,356,828
Pace required for remaining 7 months: 193,833 / month · YTD avg 187,016 / month · +3.6% lift needed
Blocks (pcs) — Annual Plan
46.96% of 35,750,820
+5.29 pp ahead of linear pace (5/12 = 41.67%)
YTD 16,788,393 (Jan–May)Remaining 18,962,427
Pace required for remaining 7 months: 2.71 M / month · YTD avg 3.36 M / month · strong buffer

C · Group Sales Monthly Detail (Actual vs Budget)

January
8.26 M
107.2%
Budget 7.71 M · +0.55 M
February
6.64 M
126.4%
Budget 5.25 M · +1.39 M
March
5.51 M
100.1%
Budget 5.51 M · ±0.00 M
April
9.11 M
120.3%
Budget 7.57 M · +1.54 M
May
6.83 M
102.11%
Budget 6.69 M · +0.14 M
Group — Sales Actual vs Budget (Monthly + Achievement %)
SAR (M) bars · Achievement % line · Jan – May 2026
MonthBudget (SAR)Actual (SAR)VarianceAchv %
January7,705,0738,258,563+553,490107.2%
February5,252,8746,641,498+1,388,624126.4%
March5,508,1845,511,526+3,342100.1%
April7,569,9409,105,236+1,535,296120.3%
May6,688,1986,829,364+141,167102.11%
June7,466,757
YTD Total (Jan–May)32,724,26936,346,188+3,621,919111.07%
Annual 2026 Budget84,884,597YTD = 42.82%Remaining 48,538,4107 months left

D · Group Production Cycles — Monthly Plan vs Actual

Monthly Cycles (thousands) · Δ% shown above each month
Jan – May 2026 · YTD Plan 894k / Actual 935k = 104.6% (Group, Jan–May)
MonthPlanActualEUPVarianceΔ%
January207,000190,652217,038−16,348−7.90%
February157,000186,162216,605+29,162+18.57%
March148,410157,489178,153+9,079+6.12%
April202,000202,102231,977+102+0.05%
May179,500198,677225,145+19,177+10.68%
June (GBQ only — GRM pending)96,00098,295117,510+2,295+2.39%
YTD Total714,410736,405843,772+21,995+3.08%
Annual 2026 Plan2,291,910YTD = 32.13%Remaining 1,555,505behind pace by 1.20 pp

E · Group OEE Components — Availability × Performance × Quality (weighted)

Availability (%)
Weighted by full time · YTD 72.95%
Performance (%)
Weighted by run time · YTD 86.89%
Quality (%)
Average of two factories · YTD 99.93%
Group OEE Monthly Roll-up = A × P × Q
GBQ & GRM combined
MonthAvailabilityPerformanceQualityGroup OEEGBQ / GRM OEE
January70.22%91.59%99.95%64.28%75.19 / 53.30
February77.20%92.76%99.92%71.55%77.08 / 66.00
March65.04%76.66%99.95%49.84%48.40 / 51.60
April78.68%85.46%99.92%67.18%71.70 / 62.70
May73.00%83.68%99.99%61.21%61.63 / 60.80
June (GBQ only — GRM pending)78.88%86.21%99.99%68.00%68.00 / —
YTD (Jan–May, weighted)73.03%86.15%99.95%62.99%66.80 / 58.90

F · Group Downtime Analysis — Reason Pareto & Planned vs Unplanned

YTD Downtime by Reason — Pareto (Group)
Hours bars + Cumulative % · Total 2,171.6 h (Jan–May, GBQ-aligned categories)
Planned vs Unplanned Downtime (Group)
YTD breakdown with hours and percentages
Planned P
1,495.75 h
68.9% of total
Cleaning 597.09h · PM 458.67h · Off 440h
Unplanned U
675.85 h
31.1% of total
Breakdown 565.09h · Other 103h · Adjustments 7.75h

G · Group Production Mix (YTD combined)

YTD Group Product Mix by Cycles
736,405 total cycles · GBQ + GRM consolidated SKUs
SKU / CategoryCyclesShareFrom GBQFrom GRM
HB 20×20469,50263.75%255,983213,519
HB 20×1572,4409.84%42,11330,327
Thermo (all variants)67,0189.10%56,34010,678
Interlock (GRM only)48,6316.60%48,631
American Block (GRM only)31,1544.23%31,154
HB 20×1023,5013.19%17,5635,938
HB 20×30 (GBQ only)18,0682.45%18,068
Curbstone (GRM only)6,0910.83%6,091
Total (Jan–May)935,082100.0%484,118450,964

H · Cycles by Factory & OEE Trend by Factory

Monthly Cycles by Factory — Stacked
in thousands · Numbers shown inside each segment
OEE Trend by Factory
Monthly OEE % with numbers labeled

I · GBQ vs GRM — Side-by-Side Comparison

MetricGBQGRMGroupLeader
Sales — YTD Actual (SAR)19,209,07717,137,11136,346,188GBQ
Sales — YTD Budget (SAR)16,775,01515,949,25432,724,269
Sales — YTD Variance (SAR)+2,434,062+1,187,857+3,621,919GBQ
Sales — YTD Achievement %114.51%107.45%111.07%GBQ
Sales — Annual Budget (SAR)43,458,05241,426,54684,884,597
Sales — Annual % achieved44.20%41.37%42.82%GBQ
Sales / cycle39.68 SAR38.00 SAR38.87 SARGBQ
Sales / block (cycles × 18)2.20 SAR2.11 SAR2.16 SARGBQ
Plan cycles432,000461,910893,910GRM
Actual cycles484,118450,964935,082GBQ
Plan achievement %112.06%97.63%104.61%GBQ
Annual cycles target1,114,0001,177,9102,291,910
Annual cycles % achieved43.46%38.28%40.80%GBQ
OEE %66.80%58.90%62.99%GBQ
Availability %76.37%69.45%73.03%GBQ
Performance %87.33%84.90%86.15%GBQ
Quality %99.99%99.91%99.95%GBQ
Avg cycle time (s)17.1517.9817.55GBQ
Blocks (M pcs)9.187.6116.79GBQ
Annual blocks % achieved42.43%53.90%46.96%GRM
Waste %0.073%0.130%0.099%GBQ
Run / Idle time (h)2,758 / 8662,425 / 1,308.55,183 / 2,174.5GBQ
Planned / Unplanned downtime (h)743.5 / 119.6752.25 / 556.251,495.75 / 675.85GBQ